KOKUYO CAMLIN (TARAPUR FACTORY, INDIA)

LOCATION MIDC Tarapur, Tal- Palghar, Dist- Thane, Pin- 401506
PRINCIPAL PRODUCTS Art supplies, poster colors, crayons, lead for mechanical pencils, etc.
COMMENCEMENT OF OPERATIONS April 1974
SITE AREA 10,045m2
Inputs 2020 2021 2022
Energy (GJ) Volume of energy inputs 21,018 20,539 45,533
Fuel 542 286 790
Electricity 20,476 20,252 44,743
Water resources(m3 City/well water 20,263 17,901 23,874
Outputs 2020 2021 2022
Atmospheric emissions(t) CO2 1,512 1,487 3,145
SOx - - -
NOx - - -
Waste emissions(t) Total waste volume 105.1 45.2 85.0
Reuse/heat recovery 105.1 45.2 85.0
Final disposal 0 0 0
Emissions into bodies of water(m3 Volume of effluent 20,263 17,901 23,874
Emissions into public water areas - - -
Emissions into sewage systems 20,263 17,901 23,874
Restricted items emitted into bodies of water Hydrogen ion concentration (PH) 6.52 7.72 7.37
COD(mg/L) 59.0 69.0 46.0
BOD(mg/L) 13.0 12.0 10.0
SS(mg/L) 38.0 2.0 23.0
Reports on Business Sites Overseas(DATA BANK)