ESG DATA

KOKUYO (MALAYSIA)

LOCATION Lot 79 & 83,Persiaran Bunga Tanjung 1,Senawang Industrial Park, 70400 Seremban, Negeri Sembilan Darul Khusus, Malaysia
PRINCIPAL PRODUCTS Workstations, phone booths, cabinets, furniture, etc.
COMMENCEMENT OF OPERATIONS October 1999
SITE AREA 58,000m2
Inputs 2022 2023 2024
Energy (GJ) Volume of energy inputs 18,958 16,553 16,556
Fuel 5,554 5,446 5,587
Electricity 13,404 11,107 10,969
Water resources (m3) City/well water 11,426 11,745 10,683
スクロールできます
Outputs 2022 2023 2024
Atmospheric emissions (t) CO2 1,170 1,052 1,096
SOx - - -
NOx - - -
Waste emissions (t) Total waste volume 209 180 148
Reuse/heat recovery 165 166 141
Final disposal 45 14 8
Emissions into bodies of water (m3) Volume of effluent 3,217 6,025 5,135
Emissions into public water areas 1,854 4,701 3,763
Emissions into sewage systems 1,363 1,324 1,372
Restricted items emitted into bodies of water Hydrogen ion concentration (PH) 8.0 7.9 7.8
COD (mg/L) 28.3 51.3 87.3
BOD (mg/L) 8.6 13.3 25.0
SS (mg/L) 9.8 17.1 10.5
スクロールできます
PAGE TOP