KOKUYO CAMLIN (SAMBA FACTORY, INDIA)

LOCATION Lane No. 9, Sidco, Phase - 1 I.G.C., Samba- 184 121
PRINCIPAL PRODUCTS Art supplies
COMMENCEMENT OF OPERATIONS January 2008
SITE AREA 10,040m2
Inputs 2020 2021 2022
Energy (GJ) Volume of energy inputs 5,219 6,820 8,680
Fuel 516 579 752
Electricity 4,703 6,241 7,928
Water resources(m3 City/well water 2,563 6,977 10,259
Outputs 2020 2021 2022
Atmospheric emissions(t) CO2 374 492 600
SOx - - -
NOx - - -
Waste emissions(t) Total waste volume 59.9 103.4 116.2
Reuse/heat recovery 59.9 103.4 116.2
Final disposal 0 0 0
Emissions into bodies of water(m3 Volume of effluent 2,563 6,977 10,259
Emissions into public water areas - - -
Emissions into sewage systems 2,563 6,977 10,259
Restricted items emitted into bodies of water Hydrogen ion concentration (PH) 7.4 7.6 7.5
COD(mg/L) 88.0 48.0 104.0
BOD(mg/L) 17.0 8.0 23.0
SS(mg/L) 19.0 10.0 56.0